Pre-Engineered Metal Buildings

A metal building quote that looks cheap on paper can turn expensive the day the first truck shows up. Somebody forgot the anchor bolt plan, the wind load was run for the wrong county, or the insulation was never priced. We would rather walk you through the whole building up front, because the steel package is only part of what you pay for.

A pre-engineered metal building is a steel frame, roof and wall system designed as a kit and sized to your loads, then built on a slab you have to have ready. Primary frames carry the weight. Purlins and girts span between them and hold the panels. Panels keep out weather. That simple chain is why these buildings go up faster than most conventional construction, and why farm, shop and hangar owners across Oklahoma keep choosing them.

We design, price and erect them statewide. We handle the foundation coordination, the steel, the sheeting, the doors and the trim, so you deal with one crew instead of four.

What comes in the package and what does not

The core package is the primary rigid frames, secondary framing, roof and wall panels, fasteners, flashing and trim. Doors, windows, insulation, gutters and skylights are usually priced as add-ons, and this is where quotes drift apart. Two bids at the same price per square foot can be missing entirely different things.

The slab is almost never in the steel package. Neither are permits, utilities, interior walls or electrical. We list all of it in one scope sheet so you can see what each line covers. If you are comparing our design-build approach against a buy-the-kit-and-find-a-crew plan, put both on the same scope sheet first. The gap is usually in the groundwork and the schedule risk, not the steel.

Codes, wind and the permit counter

Oklahoma sets minimum building codes at the state level, but cities adopt and enforce their own editions and amendments. The state board has adopted the International Codes with amendments, while several large cities list their own editions on their own pages. Which edition governs your building depends on where it sits and when your permit is applied for. We confirm that with the building department before the frame is sized, not after.

Wind is the load that matters most here. The National Weather Service Norman office counts 4,518 Oklahoma tornadoes from 1950 to the present, about 59 a year, with May the peak month. A metal building is engineered to a code wind speed, not to a tornado, and no honest builder tells you otherwise. What we can do is make sure the frame, bracing and the connections to the foundation match the design wind for your site.

How we sequence a building

We start with the site. Where does water run, how is the soil, how will a delivery truck reach the pad, and where will the steel sit while we work. Then the foundation drawings come from the frame engineering, because the reactions at each column set the footing size. Pouring first and ordering steel later is a way to be wrong twice.

Once the anchor bolts are set and the concrete has cured, erection goes quickly. Frames go up first, then secondary framing, then roof panels, then walls, with doors and trim following. A typical shop is under roof in days, not weeks. The slow parts are almost always the ones around the steel: permit review, concrete curing and material lead time.

What moves the price

Width, length and eave height drive the steel weight. Wind and snow loads drive the frame size. Bay spacing changes how many frames you buy. A taller eave on a clear-span building costs more because the columns get heavier, and that is a cost you can see on the drawings.

After the structure, the big swings are insulation, roof type, door count and the slab. Plain painted panels cost less than insulated systems. A standing seam roof costs more than exposed-fastener panels and buys you fewer maintenance visits. Steel markets also move, and a quote is only good for a short window. We tell you when ours expires and what it does to the number if you wait.

Who buys and what they build

Ranchers and growers buy equipment barns, hay storage and workshops. Fabricators and trades buy shops. Airports and flying clubs buy hangars. Small industrial owners buy warehouses and light manufacturing space. Cities buy maintenance and storage buildings. If you farm or ranch, our work for agriculture and agribusiness owners is the closest fit to what you are picturing.

The state is easy to serve by road. Three interstates meet here and more than 2,600 miles of Class I rail cross it, so steel reaches most sites without much drama. Remote ranch sites need more thought about the gravel road and the crane access than about freight. Our metal building type page walks through typical sizes and uses in more detail.

Where to go next

If your building has a crane runway or heavy process loads, read about crane and industrial buildings before you settle on a frame type. If the real problem is an existing structure, the right call may be a repair or a new building addition. Both save money when the old frame is sound.

Out west, on the highway and rail corridors around Woodward and Elk City, owners tend to want a bigger bay and a wider door than the first sketch showed. Plan for the equipment you will own in five years, not the one you own today.

Get a written scope and price

Send us your size, use and site, and we will return a scope sheet that shows what the steel, the slab and the finishes each cost. No kit-and-surprise pricing.

Common Questions

How long does a pre-engineered building take from order to finished?

Plan on permit review, shop drawings, steel lead time, the slab and then erection. The erection itself is the short part, often a matter of days for a shop-sized building. Lead time on the steel package and permit review are what stretch the calendar. We give you a written schedule that shows each of those pieces.

Can I just buy the steel and hire someone to put it up?

You can, and some owners do. The risk is the handoff. If the foundation does not match the frame reactions, or a piece is missing, the erection crew and the supplier each point at the other. We take the whole job so one company owns the problem.

Do I need an engineer stamp for a permit?

In most places a stamped set of drawings is part of the permit application for a commercial or agricultural building, though rules vary by city and county. The frame package comes with engineered drawings for the building. We check what your local building department wants before we submit anything.

Is a metal building rated for tornadoes?

No building is promised to survive a direct hit from a strong tornado. Metal buildings are designed to code wind loads, and good bracing and foundation connections help in lesser storms. If you need occupant safety, talk to us about a separate storm shelter rather than trusting the building.

What does insulation add to the cost?

It depends on the system and the R-value you want. Simple blanket insulation under the roof costs far less than insulated panels. Heated shops and offices usually justify the better system, while a hay barn does not need any.

Related

Plan Your Metal Building

Tell us about the site, the building and the schedule, and we will set up a review of scope, schedule and permitting.

Metal Building Services

See the services, building types and industries we plan and manage across Oklahoma.

Call405-477-1539