Hotels and Hospitality

A hotel guest forgives a lot, but not a leaking roof or a noisy room next to the ice machine. The structure behind a hotel decides both. In Oklahoma, limited-service and extended-stay hotels are often built on a light steel or wood frame, and steel is a strong choice where the owner wants speed, fire resistance and good sound separation. We build hotel shells, covered porte-cocheres, pool and amenity buildings, and the maintenance and laundry buildings that sit behind them.

Demand for rooms in the state is easy to see in the events and industries that draw people in. A convention center of 60,000 square feet sits in Midwest City, a casino and convention project was announced in Tahlequah, and the Route 66 museum in Clinton reported more than 930,000 visitors over 25 years. Industrial turnarounds create another market: one refinery in Ponca City brought about 2,200 contractors to town over two months, and they all needed beds.

Below is how we approach a hotel from the owner's side. We tell you what drives price and schedule and where a steel building helps or gets in the way.

Room module first, then the frame

Start with the guest room module. A typical room is about 12 to 14 feet wide, and a double-loaded corridor determines the building width. A steel frame can carry the floors and the walls, but the room module and the plumbing stacks should line up from floor to floor. If they do not, you pay for transfers later. We work from the brand prototype or the architect's room plan and lay the frame to the room module.

Four-story and under hotels are common in Oklahoma, and the fire code treats them differently from taller buildings. We check the construction type, fire ratings between rooms and corridors, and whether sprinklers affect the allowable area. Amenities such as pools, breakfast rooms and meeting spaces have their own spans, and a clear-span frame is the economical answer for a ballroom or event hall.

Where the guests come from

Location is the hotel's main asset. Interstate exits, airports, hospitals, universities and industrial parks all draw guests. Clinton sits near Exit 65 on I-40, and its museum draws travellers; Stillwater's state university lists more than 6,000 employees; and Enid has been the subject of a data center proposal that developers estimate at up to $35 billion in four campuses, with rezoning filed and no city approval yet. We treat the last as a possibility, not a promise, but construction crews on large projects tend to fill extended-stay rooms.

A good site has road visibility, an easy turn in, space for a porte-cochere and enough land for parking, detention and a trash enclosure. Sports weekends and tournaments fill rooms too, so the work we do for recreation and sports facilities often lands beside a hotel. We walk the site with the owner, look at the drainage path and flag any utility issues. A site that is a foot below the road has a cost the pro forma does not show.

Life safety and a plan for storm warnings

Hotels hold people who are asleep in a strange building. The life safety package is the heart of the design: fire-rated walls and floors, a sprinkler system, smoke control in corridors and stairs, and an alarm system that works in a room with a guest who does not know the layout. Our job is to build the structure and envelope that supports those systems, and to coordinate with the fire marshal and the licensed trades.

Weather is the other safety piece. Oklahoma averages about 59 tornadoes a year, with May the peak month, so a hotel needs a plan for guests when a warning sounds: an interior corridor, a ground-floor room away from glass, and a way to tell people. We design to the wind loads of the code, and we detail the roof and windows to resist hail. On site, we keep trucks, cranes and deliveries away from an open parking lot when an existing hotel is next door.

Sound, envelope and roof

A few details separate a quiet room from a noisy one. The wall between rooms needs mass and a break in the connection; the floor assembly needs to reduce impact sound; and plumbing should not run through the party wall. The envelope needs air sealing and good insulation so that the HVAC units in each room are small. Insulated metal panels can serve for the back-of-house and service wings, while the front of the building is often masonry, stucco or fibre-cement to match brand rules.

Roofs on hotels are often low-slope with many penetrations. A roof that sheds water cleanly and holds up in hail needs a good design; standing seam roofing is an option on sloped sections, and a membrane or hybrid system may fit the flat areas. We draw the roof plan with the mechanical layout so that curbs and drains are not an afterthought.

Shell fast, interior slow

A branded hotel runs on a development calendar that includes franchise approval, financing, permits, site work, structure, finishes, furniture and the opening date. The structure is a few months of that. What stretches the schedule is the interior trades: drywall, MEP rough-in, finishes, and furniture, fixtures and equipment delivery. So the steel and the envelope are on the critical path only until the building is dried in.

We keep a steel erection plan that avoids rain delays during the pour of upper decks, protect finished floors and set a clear punch-list process. If the project is an addition to an existing property, we sequence work to keep rooms in service. See building expansions and additions for that process. Mixed use with ground-floor retail is covered in our multifamily and mixed-use page.

What drives a hotel budget

Hotel budgets rise and fall on finishes, FF&E and the brand standards. The shell is usually a modest part. The bigger line items are the number of keys, the story count, elevators, the amount of masonry, and the pool and meeting space. Parking and stormwater can be a surprise on tight sites.

Before you finalise a design, ask for a price on two structural options: a steel frame with metal deck and a lighter wood-framed alternative. We can price steel with shop drawings and erection included. We also advise on retail pad sites in the same development, since hotels and restaurants often share a lot and a driveway.

Editions, trades and brand standards

Codes control what you can build. The state adopted the International Building Code, but some city pages list their own editions, so we find out which edition your city applies to a new application. Oklahoma does not license general contracting, but electrical, mechanical, plumbing and roofing are licensed trades; a hotel has a lot of each. Your brand will also have its own standards, and the stricter of the two controls.

Talk through your hotel site

Bring the parcel, the brand prototype and your target key count. We will return a frame concept and a schedule that shows the shell and interior separately. Read about design-build delivery to see how one team keeps those dates together.

Common Questions

Can a hotel be built with a steel frame?

Yes. A steel frame with metal deck floors can work for low-rise hotels, and it gives fire resistance and speed. The decision depends on the brand prototype, the room module and the cost of the alternatives. We price it side by side.

How many keys can the site handle?

The land sets the limit. Parking, detention and setbacks come first, and the building footprint is what remains. We lay out the site early and tell you how many keys fit before you pay for full drawings.

What causes delays on a hotel?

Mostly the interior: MEP rough-in, finishes, and the delivery of furniture and equipment. The shell is quick. We give a schedule that shows both so there are no surprises.

Do you build the pool and amenity building?

Yes, as part of the structure. Pools bring plumbing, deck drains and humidity control that require careful detailing. We coordinate those with the pool contractor.

How do weather and tornado warnings affect the design?

The code sets wind loads, and we add detailing for hail and glazing. We also work with you to identify an interior shelter route. Your insurer and local fire marshal may have views as well.

Related

Plan Your Metal Building

Tell us about the site, the building and the schedule, and we will set up a review of scope, schedule and permitting.